STRATOSPHERE
Owner:
American Casino & Entertainment Properties
No. of Hotel Rooms/suites:
2444
Casino:
Yes
Year Opened:
1995
Cost to Build:
$550M with an additional $65M expansion.
Project Team:
Paul Steelman Design Group with Ned Baldwin
CIRCUS CIRCUS
Owner:
MGM International
No. of Hotel Rooms/suites:
3767
Casino:
Yes
Year Opened:
1968
Cost to Build:
$15M, with an additional $197M in additions and renovations.
Project Team:
Rissman and Rissman Associates
Sustainability Snapshot:
As of July 2013, the property had a 30 percent monthly waste diversion rate, a 10 percent increase from 2012, while trash is sorted on-site for recycling. Additionally, MEP upgrades such as combustion controls for hot water boilers save natural gas and reduce the need for electricity during peak periods.
TRUMP
Owner:
Trump Hotel Collection
Casino:
Yes
Year Opened:
2008
Cost to Build:
$300M
TREASURE ISLAND
Owner:
MGM International
No. of Hotel Rooms/suites:
2885
Casino:
Yes
Year Opened:
1993
Cost to Build:
$450M
Project Team:
Joel Bergman
THE MIRAGE
Owner:
MGM International
No. of Hotel Rooms/suites:
3044
Casino:
Yes
Year Opened:
1989
Cost to Build:
$620M
Project Team:
Joel Bergman for Atlandia Design
Total Square Footage:
400,000
Sustainability Snapshot:
MGM replaced the property's traditional spraying sprinklers with drip systems. Additionally, the developer estimates that the flow showerheads in its guest rooms save 20 million gallons of water per year.
CAESARS PALACE
Owner:
Caesars Entertainment Corporation
No. of Hotel Rooms/suites:
4250
Casino:
Yes
Year Opened:
1966
Cost to Build:
$25M with an additional approx. $1.5B in renovations and additions.
Project Team:
Melvin Grossman and Jo Harris
Sustainability Snapshot:
Replaced 2,600 halogen MR16 lamps on the property with LED versions. Maintained The Strip's first edible garden. Collects and recycles approximately 11,000 corks every two months for recycling. Single-stream waste items are sorted for recycling on site, contributing to the recycling of more than 3,875 tons of material in 2012.
RIO ALL-SUITES HOTEL AND CASINO
Owner:
Caesars Entertainment Corporation
No. of Hotel Rooms/suites:
2520
Casino:
Yes
Year Opened:
1990
Cost to Build:
$85M with an additional approx. $200M in renovations and additions.
Project Team:
Marnell Corrao
Sustainability Snapshot:
An on-site co-generation facility generates electricity and captures waste heat for water use. In-room motion sensors automatically adjust the thermostat when guests enter and leave the room. Single-stream waste items are sorted for recycling on site, contributing to the recycling of more than 2,370 tons of material in 2012.
BELLAGIO
Owner:
MGM International
No. of Hotel Rooms/suites:
3939
Casino:
Yes
Year Opened:
1998
Cost to Build:
$1.6B, with an additional $385M in additions and rennovations.
Project Team:
DeRuyter Butler with Atlandia Design
Sustainability Snapshot:
Lake Bellagio and Cirque du Soleil's aquatic theater are replenished with non-drinkable well water.
CRYSTALS AT CITY CENTER
Owner:
MGM International
No. of Hotel Rooms/suites:
53 boutiques
Casino:
No
Year Opened:
2009
Project Team:
Daniel Libeskind and David Rockwell and Rockwell Group
Total Square Footage:
500,000
Green Certifications:
LEED Gold Core & Shell 2.0
Sustainability Snapshot:
Many of CityCenter's restaurants use farm-to-table ingredients, which require buying produce, meat, and dairy products directly from local growers. Its spas use organic or wild-crafted paraben-free products and recycle spa materials.
COSMOPOLITAN
Owner:
The Ritz Carlton/Deutsche Bank
No. of Hotel Rooms/suites:
2995
Casino:
Yes
Year Opened:
2010
Project Team:
Friedmutter Group and Arquitectonica
Total Square Footage:
6,700,000
VDARA AT CITY CENTER
Owner:
MGM International
No. of Hotel Rooms/suites:
1495
Casino:
No
Year Opened:
2009
Project Team:
Rafael Viñoly
Green Certifications:
LEED Gold NC 2.1
Sustainability Snapshot:
Each tower's envelope includes air-brows, reflective rooftops, coated windows, and high-performance glass. Its outdoor landscaping comprises native desert plant life, which is watered using an irrigation system that is equipped with moisture controls. CityCenter also worked with manufacturers and designers to develop efficient, pressurized showerheads.
ARIA AT CITY CENTER
Owner:
MGM International
No. of Hotel Rooms/suites:
4004
Casino:
Yes
Year Opened:
2009
Project Team:
Pelli Clarke Pelli
Green Certifications:
LEED Gold NC 2.2 (Convention center and showroom); LEED Gold NC 2.1 (Hotel tower)
Sustainability Snapshot:
Coatings on the structure's glass curtainwall let in daylight while blocking UV rays. Across the CityCenter properties, skylights and expansive windows bring in natural light to reduce the amount of energy used to light the space.
VEER TOWERS AT CITY CENTER
Owner:
MGM International
No. of Hotel Rooms/suites:
335 residences
Casino:
No
Year Opened:
2010
Project Team:
Helmut Jahn
Green Certifications:
LEED Gold NC 2.2
Sustainability Snapshot:
CityCenter employees undergo a LEED training as part of their orientation, which teaches them about CityCenter’s green initiatives and how that affects their responsibilities.
MANDARIN ORIENTAL AT CITY CENTER
Owner:
MGM International
No. of Hotel Rooms/suites:
392
Casino:
No
Year Opened:
2009
Project Team:
Adam D. Tihany of Tihany Design and Kohn Pedersen Fox Associates
Green Certifications:
LEED Gold NC 2.2
Sustainability Snapshot:
The CityCenter project features a central plant, smart-room control system, daylighting controls, reduced-flow water fixtures, and a green-power procurement program. Stormwater is captured and used for landscape irrigation.
MONTE CARLO
Owner:
MGM International
No. of Hotel Rooms/suites:
2992
Casino:
Yes
Year Opened:
1996
Cost to Build:
$344M
Project Team:
Dougall Design Associates
Sustainability Snapshot:
Variable frequency drives were installed to regulate electricity flow to large chiller pumps to tailor cooling to the buildings' needs. Occupancy sensors in the employee areas turn off the lights when no one is in the room. More than 200 slot machines in the casino have been upgraded with LEDs.
NEW YORK NEW YORK
Owner:
MGM International
No. of Hotel Rooms/suites:
2024
Casino:
Yes
Year Opened:
1997
Cost to Build:
$485M
Project Team:
Neil Gaskin of Gaskin & Bezanski Architecture and Engineering
Total Square Footage:
1,100,000
Sustainability Snapshot:
The property was awarded a Gold GreenLeaders designation by travel website TripAdvisor for its sustainabilty practices. LED luminaires illuminate its facade.
EXCALIBUR
Owner:
MGM International
No. of Hotel Rooms/suites:
3981
Casino:
Yes
Year Opened:
1990
Cost to Build:
$290M
Project Team:
Veldon Simpson
Sustainability Snapshot:
In 2008, The Excalibur became the first chemical-free hotel operation in the country to use a new water-based cleaning system. The property also sorts its waste and recycles the cardboard, glass, aluminum, plastic, paper, and kitchen grease. The Excalibur's buffet sends its food waste to a local composting company. The food is then mixed with landscaping clippings to make nutrient-rich mulch, which is sold locally to resorts and residences. In 2012, the property recycled more than 1,400 tons of food and compostable waste.
LUXOR
Owner:
MGM International
No. of Hotel Rooms/suites:
4400
Casino:
Yes
Year Opened:
1993
Cost to Build:
$375M
Project Team:
Veldon Simpson
Sustainability Snapshot:
Luxor replaced existing lamps with CFLs and LEDs, updated its HVAC with efficient control systems, and installed sensors and timers on exterior lights. To reduce emissions pollution from transporting goods, Luxor requires its food and beverage vendors to deliver 90 percent of all purchased items through a maximum of two distributors, resulting in fewer trips to and from distribution centers.
MANDALAY BAY
Owner:
MGM International
No. of Hotel Rooms/suites:
4752
Casino:
No
Year Opened:
1999
Cost to Build:
$950M, with an additional approx. $470M in expansions.
Project Team:
Klai Juba Wald
Sustainability Snapshot:
Offers a 100-percent biodegradable and recyclable amenity program via M3 Green Solutions. All of the public restrooms use non-aerosol air fresheners and soap that is Green Seal certified. All bottles are made from recycled plastic and all paper products are made from post-consumer recycled material.
SLS (formerly the Sahara)
Owner:
SBE
No. of Hotel Rooms/suites:
1622
Casino:
Yes
Year Opened:
1952 (Sahara); September 2014
Cost to Build:
$415M renovation
Project Team:
Gensler
Total Square Footage:
2,000,000
Sustainability Snapshot:
The property's owners chose to reuse the Sahara's original structure, rather than tear it down during its recent rennovation. More than half of the lighting in each suite is LED.
RIVIERA
Owner:
Riviera Holdings Corp./Starwood Capital
No. of Hotel Rooms/suites:
2100
Casino:
Yes
Year Opened:
1955
Cost to Build:
$8.5M
ENCORE AT WYNN LAS VEGAS
Owner:
Wynn Resort Holdings
No. of Hotel Rooms/suites:
2034
Casino:
Yes
Year Opened:
2008
Cost to Build:
$2.3B
Project Team:
DeRuyter Butler
Total Square Footage:
996,584
Sustainability Snapshot:
Recognized by the Nevada Governor's Office of Energy for meeting LEED Gold equivalency.
WYNN LAS VEGAS
Owner:
Wynn Resort Holdings
No. of Hotel Rooms/suites:
2714
Casino:
Yes
Year Opened:
2005
Cost to Build:
$2.7B
Project Team:
DeRuyter Butler
Total Square Footage:
1,800,000
VENETIAN
Owner:
Las Vegas Sands Corp.
No. of Hotel Rooms/suites:
3015
Casino:
Yes
Year Opened:
1999
Cost to Build:
1.5B
Project Team:
WAT&G
Green Certifications:
LEED Gold EB 2.0
Sustainability Snapshot:
A photovoltaic array comprising 680 panels generates 116 kW of electricity.
PALAZZO
Owner:
Las Vegas Sands Corp.
No. of Hotel Rooms/suites:
3064
Casino:
Yes
Year Opened:
2007
Cost to Build:
$1.8B
Project Team:
HKS Architects
Total Square Footage:
18,900,000
Green Certifications:
LEED Silver NC 2.2
Sustainability Snapshot:
A solar-thermal system provides hot water for the pools, spas, and several kitchens on the structure's first seven floors. An on-site nanofiltration system in the basement of the property's parking garage allows the property to take its irrigation off the grid, saving 5 million gallons of potable water annually. Sensors in the Palazzo's suites adjust the temperature based on room occupancy and a master switch near the door turns on and off all lights at once. Additionally, all architectural lighting in the suites are LED.
HARRAH'S
Owner:
Caesars Entertainment Corporation
No. of Hotel Rooms/suites:
2530
Casino:
Yes
Year Opened:
1992
Project Team:
Rissman & Rissman Associates
Sustainability Snapshot:
The property features 1.6 gpf toilets. Single-stream waste items are sorted for recycling on site, contributing to the recycling of more than 2,100 tons of material in 2012.
THE QUAD
Owner:
Caesars Entertainment Corporation
No. of Hotel Rooms/suites:
2550
Casino:
Yes
Year Opened:
1959
Project Team:
Martin Stern, Jr.
Sustainability Snapshot:
HVAC units are fitted with variable frequency drives. Single-stream waste items are sorted for recycling on site, contributing to the recycling of more than 777 tons of material in 2012.
FLAMINGO
Owner:
Caesars Entertainment Corporation
No. of Hotel Rooms/suites:
3460
Casino:
Yes
Year Opened:
1946
Project Team:
George Vernon Russell
Sustainability Snapshot:
An on-site filtration and bottling system produces mineral water packaged and served in reusable glass bottles. The lighting in the property's Center Cut Steakhouse was converted to LEDs, saving 26,776 kWh per year. Single-stream waste items are sorted for recycling on site, contributing to the recycling of more than 1,800 tons of material in 2012.
BALLY'S (MGM Grand, 1973-1993)
Owner:
Caesars Entertainment Corporation
No. of Hotel Rooms/suites:
2814
Casino:
Yes
Year Opened:
1993
Cost to Build:
$120M with an additional $14M in renovations.
PARIS
Owner:
Caesars Entertainment Corporation
No. of Hotel Rooms/suites:
2920
Casino:
Yes
Year Opened:
1999
Cost to Build:
$785M
Project Team:
Bergman, Walls & Youngblood
Sustainability Snapshot:
Low-flow fixtures include 1.8 gpm showerheads in all guestrooms. Single-stream waste items are sorted for recycling on site, contributing to the recycling of more than 3,637 tons of materials in 2012. The property is fitted with LED and CFL luminaires; its HVAC system was updated with fan coils.
PLANET HOLLYWOOD
Owner:
Caesars Entertainment Corporation
No. of Hotel Rooms/suites:
2500
Casino:
Yes
Year Opened:
2007
Cost to Build:
$100M in renovations
Project Team:
Skidmore, Ownings & Merrill
Sustainability Snapshot:
Like Caesars' other properties, it provides marketing, registration, and post-event surveys online, printed double-sided, or printed on FSC- or SFI-certified paper. Single-stream waste items are sorted for recycling on site, contributing to the recycling of more than 1,890 tons of material in 2012.
HARD ROCK
Owner:
Brookfield Asset Management/Warner Gaming
No. of Hotel Rooms/suites:
670
Casino:
Yes
Year Opened:
1995
Cost to Build:
$150M
Project Team:
Worth Group Architects
THE SIGNATURE
Owner:
MGM International
No. of Hotel Rooms/suites:
576
Casino:
No
Year Opened:
2006
Project Team:
Bergman, Walls & Associates and SFA Design
MGM GRAND
Owner:
MGM International
No. of Hotel Rooms/suites:
6017
Casino:
Yes
Year Opened:
1993
Cost to Build:
$1B original, with an additional $770M in renovations.
Project Team:
Veldon Simpson
Sustainability Snapshot:
The upstream recycling program implemented in the property's food and beverage outlets serves as a model for MGM's other properties.
TROPICANA
Owner:
Tropicana Las Vegas Hotel and Resort Inc.
No. of Hotel Rooms/suites:
1467
Casino:
Yes
Year Opened:
1957
Cost to Build:
$15M with an additional $200M renovations.
Project Team:
Ben Jaffe and Alex Yemenidjian
Sustainability Snapshot:
Features include an an on-site water purification process at the property's restaurant Biscayne, LED lighting throughout the hotel, and an energy management system.
The information was sourced from individual developers and from resources kept by the Architecture Studies Library at the University of Nevada, Las Vegas

































